23
26 may 2024
Construction of the 'Ortelius' started in 1987 in Lochristi.
The hull is a metal S-frame. All metals used are cold formed.
The ship was launched in 1995 and completed in the outer harbor in Ghent. The ship sailed from Ghent to Ostend in 2023.